landford stone logo

Menu
Worktop Templating & Fitting

Worktop Templating & Fitting

1 | Measuring your surface area

Once your order has been received a date will be arranged for a templater to visit you at your house/site.  All the kitchen or bathroom units must be installed and fixed, including your sink; if the sink is either an ‘Undermount’ or ‘Belfast’ or’ Butler’ sink. If you have chosen an ‘Inset’ sink (the sink sits on top of the surface, usually incorporating the drainer) please ensure that the sink is left on site.  All appliances should also be on site to enable the templater to check relevant measurements.

If you are replacing existing worktops, these will need to be removed before templating commences.

2 | Precision Manufacture by Skilled Craftsman

The stone for your project is carefully selected from our yard and quality checked before cutting. The templates are laid on the stone, which is cut and polished, including the underside of the front edges, which are smoothed and all pieces are hand-finished, quality checked and sealed with Dry Treat ™ before they leave the factory.

3 | Fitting

The worktop will be fitted by a skilled and experienced team, who will install your worktop 5 working days after templating*. The surface will be sealed again when fitted.

* Please note that special edged jobs, which require considerably more factory time to fabricate, may, by prior arrangement have a longer turnaround.

Send this to friend